Skip to content
Flathead Intel
ApprovedLand-use application

8 lane drive through lanes and ATM lane at 135 E Center St

135 E Center St

Description

8 lane drive through lanes and ATM lane

As written by the source.

Timeline

  1. Jul 11, 1995 · Conditional use permit

    Conditional use permit KCU-95-03 approved: 8 lane drive through lanes and ATM lane.

    Kalispell conditional use permits · Open the source document(opens in a new tab)