PlannedRoad and bridge
Essex - Devil Creek
US 2
Description
The Essex – Devil Creek project will replace the top layer of pavement, followed by a chip seal, fog seal, and upgrade the guardrail along the US Highway 2 from the bridge end across from Essex at mile post 180.5 to the railroad bridge at mile post 184.3. From mile post 184.3 to the Devil Creek campground area, at mile post 189.9, the project will crack seal, chip seal, and fog seal the highway. The project is being developed to prolong and preserve the existing pavement.
As written by the source.
Timeline
Date not stated · first seen Nov 26, 2026 · MDT project status
MDT lists this project as planned: type resurface, construction year 2027.
MDT active projects in Flathead County · Open the source document(opens in a new tab)