Skip to content
Flathead Intel
Contract awardedRoad and bridge

Flathead River-3M NW Big Fork

Montana 82

Description

The existing steel bridge known as the "Sportsman's Bridge" provides access across the Flathead River on MT Highway 82 between the towns of Kalispell and Bigfork. The existing bridge is deficient based on deck condition, width, and traffic volume. It is also a non-redundant two-girder system and is ranked high for seismic retrofit. Based on these conditions, the existing bridge is functionally obsolete, therefore replacement is necessary. MDT will replace the 686-feet-long bridge with a new 706-feet-long structure, which will be built to the south side of the existing bridge. This new structure will contain two 12-foot travel lanes and two 10-foot shoulders. By widening the roadway and adding sizeable shoulders, MDT is providing a safer corridor for travelers. A result of shifting Sportsman’s Bridge to the south will be an impact to the Sportsman’s Bridge Fishing Access Site (FAS), located on the east bank of the Flathead River. To address this impact, MDT has been coordinating with the Montana Department of Fish, Wildlife and Parks (FWP) as FWP plans to construct a new FAS on the west bank of the Flathead River, just south of the highway.

As written by the source.

Timeline

  1. Date not stated · first seen Nov 26, 2026 · MDT project status

    MDT lists this project as awarded for construction: type bridge, construction year 2025, estimated construction cost $32,845,132.

    MDT active projects in Flathead County · Open the source document(opens in a new tab)