Skip to content
Flathead Intel
ApprovedLand-use application

replace existing central plant facility with new 18,250 sq ft facility at 310 Sunnyview Ln

310 Sunnyview Ln

Description

replace existing central plant facility with new 18,250 sq ft facility

As written by the source.

Timeline

  1. Dec 20, 1999 · Conditional use permit

    Conditional use permit KCU-99-10 approved: replace existing central plant facility with new 18,250 sq ft facility.

    Kalispell conditional use permits · Open the source document(opens in a new tab)

Permits at or next to this location

Listed because they are within about 200 feet of the outline above. Being close does not mean a permit belongs to this project.